01 Rail infrastructure
Technicentre Sud-Est Européen
- Location
- Paris 12th
- Programme
- Two multi-service buildings and an Infrapôle
- Contractor
- Colas France · Bouygues Bâtiment
- Project owner
- SNCF
- ARCADI mission
- Reinforcement drawings for construction
- Work package
- Structural works
- Status
- Structural works completed: September 2026
An 8,800 m² multi-service building on a live SNCF site, ready to host the new generation of TGV high-speed trains from 2027.
As part of the modernisation of the Technicentre Sud-Est Européen in Paris, ARCADI BÂTIMENT produces the reinforcement drawings for the structural works package on behalf of Colas France and Bouygues Bâtiment.
The project includes an 8,800 m² multi-service building (BMS), built on an operational SNCF site. It is part of a modernisation programme preparing for a new generation of TGV trains from 2027.
Our mission: deliver precise reinforcement drawings that meet the technical requirements and remain consistent with all construction documents, at the pace of a major rail infrastructure project.
The site in figures
- Multi-service building
- 8,800 m²
- Foundation piles
- 119
- Pile caps
- 112
- Slabs poured
- 5,970 m²
- Precast columns
- 355