01  Rail infrastructure

Technicentre Sud-Est Européen

Two multi-service buildings and an Infrapôle

Paris 12th · Structural works completed: September 2026

Colourful facade of the multi-service building at the Technicentre Sud-Est Européen, Paris 12th
(A)Project sheet
Location
Paris 12th
Programme
Two multi-service buildings and an Infrapôle
Contractor
Colas France · Bouygues Bâtiment
Project owner
SNCF
ARCADI mission
Reinforcement drawings for construction
Work package
Structural works
Status
Structural works completed: September 2026
(B)The project

An 8,800 m² multi-service building on a live SNCF site, ready to host the new generation of TGV high-speed trains from 2027.

As part of the modernisation of the Technicentre Sud-Est Européen in Paris, ARCADI BÂTIMENT produces the reinforcement drawings for the structural works package on behalf of Colas France and Bouygues Bâtiment.

The project includes an 8,800 m² multi-service building (BMS), built on an operational SNCF site. It is part of a modernisation programme preparing for a new generation of TGV trains from 2027.

Our mission: deliver precise reinforcement drawings that meet the technical requirements and remain consistent with all construction documents, at the pace of a major rail infrastructure project.

The site in figures

Multi-service building
8,800 m²
Foundation piles
119
Pile caps
112
Slabs poured
5,970 m²
Precast columns
355
Construction site and lit tower cranes at blue hour

A construction project?

Let’s talk structure.

Send us your project file: drawings, brief, project stage. We will get back to you quickly with a proposal.

Request
a quote